DIMM Automated Final Test System
No items found.
GTK-SPT1

DIMM Automated Final Test System

DIMM Automated Final Test System

This automated solution is engineered for the final functional testing and burn-in verification of DIMM modules, featuring robotic handling, PLC control, and system integration.

  • Dual-Channel Robotics High-speed 2-pick/2-place arm automates DIMM insertion and removal, eliminating manual labor.
  • Cycle Optimization Scaled test-module density aligns with burn-in cycle times, maximizing TACT time.
  • Automated Sorting Real-time pass/fail sorting independently classifies defective units into dedicated trays.
Get Quote

Product Spec

Demission (inch): 110(L) x 106(W) x 74.8(H)

Robotics: 2-pick/2-place  configuration

Pneumatics: 5-6  kgf/cm2

Operation Temperature: 10℃-40℃

Power: 220V,  1 Phase, 50A, 11KVA

Training: 2 x  4 hours

Warranty: One-year  after acceptance

Technical Documentation: User  Manual, Electrical Schematic, Maintenance Manual

規格下載

Product Inquiry

Thank you for your interest.
Your request has been received.
Oops! Something went wrong while submitting the form.